Scope

​A cooler unit on an offshore platform was due to be removed for planned maintenance.​ The lift path of the cooling unit was blocked by a 2” Copper Nickle Deluge line so the client was going to have to move it…​ The deluge line is critical so needs to be reinstated as quickly as possible. When the cooler unit completes maintenance there will be a requirement to move the deluge line again.

 

 

Solution

The deluge line was cut and 2 x Lokring Copper Nickle Flange connections were installed on to the pipes to create a break point in the line. ​ Lokring flanges require NO HOT WORK and can be installed even with moisture present in the pipe which means no drying required after draining. ​